FIDIC Extension of Time Claim & Delay Damages: 1999 Vs 2017
This course contains the use of artificial intelligence.Master FIDIC extension of time (EOT) claims and Delay Damages (liquidated damages) under the FIDIC Re...

What You'll Learn
- Set the time baseline: the Commencement Date, every Time for Completion and the Programme (Sub-Clauses 8.1 to 8.3)
- Build or test an EOT claim cause by cause under 1999 Sub-Clause 8.4 and 2017 Sub-Clause 8.5
- Apply the 2017 10% quantity rule and the rule that an extension of time (EOT) can increase but never decrease
- Handle concurrent delay by what the Contract actually says, and know what it leaves to the governing law
- Decide who pays for acceleration (1999 8.6 / 2017 8.7)
- Calculate Delay Damages, apply the maximum, and reduce the rate for Parts taken over (1999 8.7 / 2017 8.8 and 10.2)
About This Free Course
This course contains the use of artificial intelligence.
Master FIDIC extension of time (EOT) claims and Delay Damages (liquidated damages) under the FIDIC Red Book 1999 and 2017, the two editions you will meet on construction projects worldwide.
The Works are late. Is the Contractor entitled to an extension of time? Can the Employer deduct Delay Damages, and how much? On a FIDIC contract, the answer depends on which edition you signed, and the 1999 and 2017 Red Books do not answer these questions the same way. Apply the wrong edition's rule and a valid EOT claim can fail, or a Delay Damages deduction can be wrong.
This practical FIDIC course works through Clause 8 of the Red Book 1999 and Red Book 2017 side by side, together with Sub-Clause 10.2 on Parts taken over. For each rule you see what each edition says, what changed, and what it means for your next decision on time, delay and construction claims. Where it matters, it also flags wording changed in FIDIC's 2022 reprint of the 2017 text.
What you will learn:
Set the time baseline: the Commencement Date, every Time for Completion and the Programme (Sub-Clauses 8.1 to 8.3)
Build or test an EOT claim cause by cause under 1999 Sub-Clause 8.4 and 2017 Sub-Clause 8.5
Apply the 2017 10% quantity rule and the rule that an extension of time (EOT) can increase but never decrease
Handle concurrent delay by what the Contract actually says, and know what it leaves to the governing law
Decide who pays for acceleration (1999 8.6 / 2017 8.7)
Calculate Delay Damages, apply the maximum, and reduce the rate for Parts taken over (1999 8.7 / 2017 8.8 and 10.2)
Why this FIDIC EOT course is different:
Built around real decisions: pause-and-decide exercises with worked dates and numbers in every lecture
FIDIC 1999 vs 2017 compared clause by clause, so you can work confidently on old and new contracts
A full workshop: one delay event assessed under both editions, from cause to EOT to Delay Damages
A final quiz of 10 scenario questions to test your contract management judgement
A downloadable Quick Reference sheet for both editions
About 41 minutes of focused video, with no filler, so you can finish it in one sitting
Who this course is for:
Contract, claims and commercial managers on FIDIC projects
Quantity surveyors and cost engineers handling time-related claims
Planners, schedulers and project controls staff who prepare or review EOT claims
Engineers and Employer's representatives who determine extension of time and Delay Damages
Contractors' project managers who need to protect time and avoid Delay Damages
Anyone preparing for FIDIC certification or moving between 1999 and 2017 Red Book projects
Enrol now and handle your next extension of time claim or Delay Damages deduction with the right edition's rules.
This course is independent practical training. It is not affiliated with or endorsed by FIDIC, and it is not legal advice. Always read your own Contract and Particular Conditions.
Who Should Take This Course
"FIDIC Extension of Time Claim & Delay Damages: 1999 Vs 2017" is aimed at people who want a practical, structured introduction to business without paying full price for it. It's a solid fit if you're starting out in business and want a guided course rather than piecing tutorials together yourself, if you've tried free YouTube content on the topic and want something more organized, or if you already work in a related area and want a refresher you can finish at your own pace. Since enrollment happens on Udemy itself, you keep full access to view the lectures, download any provided resources, and revisit the material later — this isn't a stripped-down or time-limited version of the course.
Why This Course Is Worth Taking
Our take: this listing earns a spot on DeelCart because the coupon we verified actually brings the price to $0, not just a token discount, and the course carries a 4.5/5 rating on Udemy. That combination — real reviews plus a working 100% OFF code — is what we look for before publishing a business course. It won't replace hands-on experience or a full degree program, but as a low-risk way to test whether business is worth pursuing further, or to pick up one specific skill, the free price tag makes it an easy yes while the coupon lasts.
Pros & Cons
👍 Pros
- 100% free to enroll via this coupon (normally $39.99)
- Lifetime access on Udemy once enrolled, even after the coupon expires
- Rated 4.5/5 by past students on Udemy
- Self-paced — no fixed schedule or live sessions to attend
👎 Cons
- Coupon is time-limited and can expire before you enroll
- No live instructor support — questions go through Udemy's Q&A, not us
- Certificate is a Udemy completion certificate, not an accredited qualification
Grab this course free before the coupon expires.
Save $39.99 · limited-time 100% OFF coupon
Frequently Asked Questions
Is "FIDIC Extension of Time Claim & Delay Damages: 1999 Vs 2017" really free?
Yes — we verified a 100% OFF Udemy coupon for this business course before publishing it. Enroll directly on Udemy using the button on this page; no credit card is needed while the coupon is active.
How long will this coupon last?
Udemy coupons typically last 1–3 days or expire after roughly 1,000 enrollments, whichever comes first. If the price on Udemy no longer shows $0 when you click through, the coupon has expired since we last checked it.
Do I keep access after the coupon expires?
Yes. Once you enroll while the coupon is live, "FIDIC Extension of Time Claim & Delay Damages: 1999 Vs 2017" is yours to keep on Udemy — including any future updates the instructor makes — even after the coupon runs out.
More Free Business Courses

CIPS L5M6 Category Management | 300 Q

Data Governance Pro: Implementa, Diagnostica y Lidera

Presentation Expert: AI & GPT, Pitch Decks, Business Speech
